(Optional) This text will appear in the inbox preview, but not the email body.
Colton GlasgowEarned the rank of Eagle in 2017 |
|
Badger Mountain Parking Lot Trail Work We put 3/8 minus gravel from the upper parking lot to the trail head (stairs) at Badger Mountain park in Richland, WA. We did this to prevent flooding that occurred on the trail which caused erosion from pooling water and traffic avoiding the large amounts of water. We also installed two “stay on trail” signs along the same path. One sign has since been removed and has been relocated.
Near by GeoCaches
|
|
|
|
|